All Episodes
April 1, 2017 - Clif High
06:49
Visit to the trimaran - April 1, 2017
| Copy link to current segment

Time Text
Okay.
We're down here at the trimeran.
Let me stand here at the opening.
This is what we've got done so far.
A lot of junk still hanging around here.
You can see our this is the main saloon area.
These will be the settees right here.
Right there.
And uh that's an extra bunk area theoretically, as is this area over here.
These are double wides, uh double beds, so there's four people that could sleep up here.
And um I think actually it sleeps eight, really, if you look at it a particular way.
Uh but I don't know that we're gonna put um a lot of these bunks in place.
Uh those are the back there, that's the um uh channel, the uh tube or the space for the uh dagger board.
We've got those.
We're just using up some yellow gel coat here, and then we're gonna cover it all with white, uh so it's all nice and easy to clean.
Uh so we're gonna cover all of this area here in white gel coat, finish out all of this in gel coat, clean out the ama area, that'll be storage, and uh tanks for water and all of that.
And we'll probably have a freezer refrigerator combination thing up there.
This is what it mounts to your cabinet space right here, which of course is where we're doing all of our gel coat staging.
This is where the stove's gonna go, right here.
You're still in your range, so this is your salon area.
I'm gonna back up here through this little hatch.
And so there's the main hatch area.
Another access hatch here, lots of uh hatches and port lights.
Currently have paper on them, but we're gonna get them all cleaned off here in a while.
So now we're into the area here, it's a little dark.
I apologize for that, we've got no light.
Uh this area here is our area for um chart table and for a hanging locker, which is you know, a closet to all the regular humans.
And uh then this is what's known as a sleeping bag berth, uh where you have somebody could sleep there.
Built in steps, and this is another set of built-in steps, another sleeping bag berth, another storage area back there, and the other part of the ama.
And then this would be our charting table, it's gonna be built in here for all of our navigation stuff.
And then you go through here and you're into the head.
This'll be removed right here.
And um that piece will be removed.
That'll be a shower.
So we'll have our um uh shower area right here.
Uh little uh sink and vanity thing there, storage back this way there's the front part of the AMA.
All of this area in here is epoxy because it's gonna be wet all the time.
So we're gonna finish this out in epoxy instead of gel coat.
Finish this with epoxy here, sand it all down, and then it'll get a um uh waterproof paint.
And another hatch over our head, and uh look out one of the forward hedges here real quick.
Not much to see.
We'll go outside and I will try and edit out all of the stuff that will make people sick.
Give us a bit of light here for a minute.
This is the aft cabin.
We'll have to get in and pump out.
Get rid of some of the water in here because of the rain.
And we have to check out everything here, so lovely day on the sound.
Be nice if we had um some sunshine, but it's alright.
There's the aft cabin.
Water's just soft, very soft today.
Okay.
You have to put a I've got to put a tarp on all of this and get us dry so we can do gel coat and finish out our um pilot house so then we can work in the warm and get the rest of this area dry, pumped out, and um engine running and so on while we start to build our mast.
Export Selection